“It turns out that about 13 layers of 2†lumber (~twentyâ€) was about correct. I nailed up the stack, then drilled two holes in the base of the jacks and secured them with couple of lag screws. I discovered a bolt that in good shape the threads from the wing tiedown and ground the hex head into a bullet condition.Up coming, level f